Completed multifamily kitchen installation

Case Studies

Real Projects. Real Results.

See how we deliver cabinet infrastructure for multifamily developments, portfolio renovations, and specialized housing projects across the country.

250-Unit Class A Apartment Complex
New Construction
Professional Series — White Shaker
250
Units
8 months
Timeline
Atlanta Metro, GA

250-Unit Class A Apartment Complex

Atlanta Metro, GA|8 months

The Challenge

Developer needed consistent cabinet quality across 250 units with phased delivery to match a tight 8-month construction schedule. Previous vendor had missed two delivery windows on an earlier phase.

Our Solution

Gentry Concepts assigned a dedicated project manager, created unit-type-specific cabinet packages, and coordinated phased deliveries across four buildings. AutoCAD layouts were provided for every unit type.

Results

  • 100% on-time delivery across all four phases
  • Zero warranty claims in first 12 months
  • 3-day shipping on each delivery phase
  • Standardized specs reduced installation time by 20%
500-Unit Portfolio Renovation Program
Portfolio Renovation
Essential Series — White & Espresso
500
Units
18 months (rolling)
Timeline
Southeast US (Multiple States)

500-Unit Portfolio Renovation Program

Southeast US (Multiple States)|18 months (rolling)

The Challenge

Property management company needed to renovate kitchens across 12 properties in 4 states over 18 months. Consistency, cost control, and schedule coordination were critical.

Our Solution

Created a standing cabinet program with locked specifications and priority production. Drop-shipped directly to each property location with coordinated scheduling to minimize unit downtime.

Results

  • 12 properties across 4 states served from one program
  • Consistent finish quality across all 500 units
  • Average 10-day turnaround from order to delivery
  • Reduced cabinet procurement cost by 15% vs. previous vendor
120-Unit Senior Living Community
New Construction
Professional Series — Gray Shaker
120
Units
6 months
Timeline
Charlotte, NC

120-Unit Senior Living Community

Charlotte, NC|6 months

The Challenge

Senior living developer required ADA-compliant cabinet configurations with specific heights, pull hardware, and soft-close mechanisms. Standard off-the-shelf products didn't meet requirements.

Our Solution

Engineered custom cabinet configurations meeting ADA guidelines while maintaining the aesthetic quality of our Professional Series. Provided detailed compliance documentation for inspections.

Results

  • Full ADA compliance across all 120 units
  • Passed all municipal inspections on first review
  • Soft-close hardware standard on every cabinet
  • Delivered 2 weeks ahead of schedule